PROBLEM
|
RATE OF CHEMICAL APPLIED
|
SOIL TYPE
|
CROP TO BE PLANTED
|
RECLAIM APPLICATION
|
RESULTS
|
Mint field removed and plated to Timothy Hay
|
1 lb per acre
|
Sandy Loam
|
Timothy Hay
|
2 qt per acre after first cutting
|
Farmer wanted to apply RECLAIM at planting but chemical man said not needed as Sinbar was managed in a a way not to have any carryover. Timothy was excellent but had stunted growth – first cutting reduced yield 1 1/2 acre costing owner $32, 000. RECLAIM applied 2nd cutting was equal to Timothy yields on rest of farm
|
Sinbar
|
1 1/2 lb per acre
|
Sandy Loam
|
Onions 18 months after Sinbar was applied
|
2 qt per acre late October
|
Excellent response improved stand, reduced crusting, improved water retention. No yield data was provided but grower uses RECLAIM on ALL onion ground.
|
Sinbar |
1 1/2 lb per acre applied 24 months earlier
|
Sandy Loam
|
2 qt per acre very early spring
|
7+ ton per acre increased yield – better quality – more profit. Because of other unspecified benefits, grower now appliesRECLAIM on all onion ground
|
|
Sinbar
|
1 1/2 lb per acre
|
Sandy Loam
|
2 qt per acre early spring preplant
1 qt per acre at golf ball size |
No detectable damage could be found. Yield: 37 ton per acre was 3 ton/acre better than control
|
|
Sinbar
|
1 lb per acre
|
Sandy Loam
|
2 qt per acre June 1st |
Treated acres yielded 34+ ton per acre. Untreated yielded 29.79 ton per acre.
|
|
Sinbar
Mint froze out due to bad winter conditions |
1 1/2 lb per acre
|
Sandy Loam
|
2 qt per acre |
27 bags per acre clean seed on treated acres
24 bags per acre clean seed on untreated acres |
|
Sinbar
|
1 lb per acre
|
Sandy Loam
|
2 qt per acre
30 days preplant |
68 acres were treated. Where Sinbar had been applied, single application – Excellent performance on detoxification. Where double applications of Sinbar was made at the end of fields, beans were damaged. Yield 19 bags per acre. Additional 1 qt of RECLAIM should have been applied when chemical burn on leaves appeared. Field should have been irrigated heavier at time of 2nd RECLAIM application.
|